Customer: Fischer Sports GmbH
In a short time, without losing the quality of work, the arrangement of office premises and bathrooms was carried out by installing wall and ceiling sandwich panels. Sewerage pipelines were laid, metal-plastic windows and doors were installed, and other general construction works were performed.
During the reconstruction of the shop, fire safety measures were significantly strengthened in compliance with both Ukrainian and European standards and regulations. When choosing materials, regardless of their origin - both domestic and foreign - the ratio of quality and environmental friendliness was taken into account.