Works on construction of unloading substations 10/0.4 kV and networks to them.

Customer: Prykarpattyaoblenergo Joint Stock Company

Works on construction of unloading substations 10/0.4 kV and networks to them.
No items found.

Our company has joined the implementation of the Investment Program for the distribution of electricity of Prykarpattyaoblenergo for 2023.

The construction of unloading substations 10/0.4 kV and networks to them was carried out in several stages:

1. Excavation works to prepare the site for the construction of the substation.

2. Installation of the necessary electrical equipment, such as transformers, switchgear, automation, protective devices, etc.

3. Connection of power supply and grounding systems.

4. Carrying out commissioning works.